Listed below are some of the remodeling project categories and phases that are considered and accounted for when the Design Build Planners staff looks at a remodeling project. Find all of the 47 remodeling project categories and phases listed below.
- Pre-Production Tasks
- Site Preparation
- Demolition and Debris Removal
- Excavation
- Concrete
- Masonry
- Framing
- Roofing
- Skylights
- Gutters and Leaders
- Exterior Trim
- Deck and Railing
- Patio or Walkway
- Siding – Vinyl
- Siding – Other Material
- Exterior Doors
- Windows – Vinyl
- Windows – Wood
- Plumbing – Bathroom
- Plumbing – Kitchen
- Plumbing – Other
- Plumbing – Fixtures
- Ventilation
- Heating and Cooling
- Electrical – New Work (Open Walls)
- Electrical – Old Work (Finished Areas)
- Electrical – Lighting
- Insulation
- Drywall
- Wall or Ceiling Covering
- Interior Doors
- Interior Molding and Trimwork
- Cabinetry
- Bathroom Accessories
- Interior Stairs and Railings
- Fireplace
- Countertop
- Shower Doors and Glass Block
- Fiberglass Work
- Appliances
- Hardwood, Engineered, and Laminate Flooring
- Carpeting
- Tile
- Painting
- Clean Up and Debris Removal
- Maid Service
- Specialty Trades
Further, when you choose a full service contractor from the DBPlanners Preferred Remodelers Network the following are also accounted for:
- Project Management
- Overhead
- Profit