Plan # 2 is referred to as the “Modest” option. It typically includes some of features that the homeowners want and need for their planned remodeling project, but is designed to be value driven. Plan # 2 is generally closer to a homeowner’s lower end of their project budget. Below are computer design options for a master bathroom remodeling project in Burlington County, New Jersey. Beneath the photos is an overview list of what is included for this bathroom design option.
CLICK HERE to return to this project’s blog entry
- Gut shower to stud (8’) and subfloor (remove boxed area to ceiling)
- Remove flooring to sub floor
- Remove vanity
- Remove tub (store in adjacent room)
- Remove tub deck material
- Remove all molding
- Remove all electrical
- Custom shower with bench and niche
- Rain head and handheld
- Frameless shower door
- New vanity, leave pluming in existing locations
- Reinstall tub over granite deck
- Wood panel tub deck face
- Tile in shower to ceiling with feature strip
- Tile in tub area to 48”
- Tile at vanity 12”
- Tile in non-wet walls to 48”
- Tile on shower floor
- Tile on bath floor
- Lighting per plan
- Crown molding
CLICK HERE to return to this project’s blog entry
Find Out If DESIGN BUILD PLANNERS Is Right For You click here →